Last Stop Garage Season 2 Episode 5
Last Stop Garage
Season 2

Ep 5. How To Build a Better Stair Truck

  • TV-PG
  • March 6, 2019
  • 22 min

In this episode of Last Stop Garage, the crew at CRB Automotive are tasked with building a better stair truck for a local hotel. The current stair truck is outdated and in need of an upgrade, and the hotel has turned to CRB to come up with a solution.

The team begins by assessing the current stair truck and identifying its limitations. They note that the truck is too low to the ground and has a small platform, making it difficult for guests to easily access the stairs. They also note that the stairs are too narrow, which can be dangerous for guests as they try to navigate their way up and down.

To address these issues, the team decides to build a custom platform that can be raised and lowered to the appropriate height for guests to access the stairs. They also decide to widen the stairs and add a handrail to improve safety.

Next, the team gets to work building the new platform. They carefully measure and cut the steel beams before welding them together to create the frame. Once the frame is completed, they add a wooden deck to create a stable platform.

While the platform is being built, Robin, the team's mechanic, turns his attention to the stair assembly. He carefully removes the old stairs and measures the space to determine the best size for the new stairs. He then cuts the steel tubing to size and welds it together to create a sturdy frame.

Once the frame is complete, the team adds metal treads to create the steps. They also add a handrail for safety, carefully welding it to the frame to ensure it is securely attached.

With the platform and stairs complete, the team assembles the stair truck and tests it out to ensure it works as intended. They raise and lower the platform to different heights to ensure it is adjustable for guests of all heights, and they test out the stairs to ensure they are wide enough and stable enough for guests to safely navigate.

Finally, the team completes the project by painting the stair truck to match the hotel's branding. They present the finished product to the hotel staff and are pleased to see their delighted reaction.

Overall, this episode of Last Stop Garage demonstrates the team's skill at custom fabrication and innovation. They were able to take on a unique challenge and create a tailored solution that will improve the guest experience at the hotel for years to come.

Description
Watch Last Stop Garage - How To Build a Better Stair Truck (s2 e5) Online - Watch online anytime: Buy, Rent
Last Stop Garage, Season 2 Episode 5, is available to watch and stream on Motortrend. You can also buy, rent Last Stop Garage on demand at Amazon Prime, Amazon, Google Play, Apple TV online.
  • First Aired
    March 6, 2019
  • Content Rating
    TV-PG
  • Runtime
    22 min
  • Language
    English