This Old House Hour Season 7 Episode 12 Episode 12
- December 18, 2008
This episode features the addition of granite steps to the entry porch, the pergola's precast footings and Goshen stone is added to the front patio. Also, the rough sawed, reclaimed white oak flooring is placed down on the first floor; a cell phone zone extender is installed and a look a kitchen appliances. A huge boulder is split open and removed from the backyard; loose pipes are secured in the shower stall; and how to properly grip a hammer.